Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 34

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Study on the effect of long-term high temperature irradiation on TRISO fuel

Shaimerdenov, A.*; Gizatulin, S.*; Dyussambayev, D.*; Askerbekov, S.*; Ueta, Shohei; Aihara, Jun; Shibata, Taiju; Sakaba, Nariaki

Nuclear Engineering and Technology, 54(8), p.2792 - 2800, 2022/08

 Times Cited Count:7 Percentile:90.45(Nuclear Science & Technology)

Journal Articles

Numerical modeling assistance system in finite element analysis for the structure of an assembly

Nakajima, Norihiro; Nishida, Akemi; Kawakami, Yoshiaki; Suzuki, Yoshio; Sawa, Kazuhiro; Iigaki, Kazuhiko

Proceedings of 23rd International Conference on Nuclear Engineering (ICONE-23) (DVD-ROM), 5 Pages, 2015/05

A numerical analysis controlling and managing system is implemented on K, which controls the modelling process and data treating, although the manager only controls a structural analysis by finite element method. The modeling process is described by the list of function ID and its procedures in a data base. The manager executes the process by order in the list for simulation procedures. The manager controls the intention of an analysis by changing the analytical process one to another. Experiments were carried out with static and dynamic analyses.

Journal Articles

Analytical results of coolant flow reduction test in the HTTR

Takamatsu, Kuniyoshi; Nakagawa, Shigeaki; Iyoku, Tatsuo

Proceedings of 11th International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-11) (CD-ROM), 12 Pages, 2005/10

Safety demonstration tests using the HTTR are in progress to verify the inherent safety features, to improve the safety design and the technologies for High Temperature Gas-cooled Reactors (HTGRs). The coolant flow reduction test by tripping one or two out of three gas circulators is one of the safety demonstration tests. The reactor power safely becomes a stable level without a reactor scram and the temperature transient of the reactor-core is very slow. The SIRIUS code was developed to analyze reactor transient during the tests with reactor dynamics. This paper describes the validation of the SIRIUS code with the measured values of one and two gas circulators tripping test at 30% (9 MW). It was confirmed that the SIRIUS code was able to analyze the reactor transient within 10% during the tests. The result of this study and the way of resolving problems can be applied to development for not only the commercial HTGRs but also the Very High Temperature Reactor (VHTR) as one of the Generation IV reactors.

JAEA Reports

Evaluation of heat exchange performance for intermediate heat exchanger in HTTR

Tochio, Daisuke; Nakagawa, Shigeaki

JAERI-Tech 2005-040, 39 Pages, 2005/07

JAERI-Tech-2005-040.pdf:1.88MB

In High Temperature Engineering Test Reactor (HTTR) of 30 MW, the generated heat at reactor core is finally dissipated at the air-cooler by way of the heat exchangers of the primary pressurized water cooler and the intermediate heat exchanger. Heat exchangers in main cooling system of HTTR should satisfy two conditions, achievement of reactor coolant outlet temperature 850 $$^{circ}$$C/950 $$^{circ}$$C and removal of reactor generated heat 30 MW. That is, heat exchange performance should be ensured as that in heat exchanger designing. In this report, heat exchange performance for Intermediate heat exchanger (IHX) in main cooling system is evaluated with rise-to-power-up test and in-service operation data. Moreover, the applicability of IHX thermal-hydraulic design method is discussed with comparison of evaluated data with designed value.

JAEA Reports

Validation of the TAC/BLOOST code (Contract research)

Takamatsu, Kuniyoshi; Nakagawa, Shigeaki

JAERI-Data/Code 2005-003, 31 Pages, 2005/06

JAERI-Data-Code-2005-003.pdf:4.83MB

Safety demonstration tests using the High Temperature engineering Test Reactor (HTTR) are in progress to verify the inherent safety features for High Temperature Gas-cooled Reactors (HTGRs). The coolant flow reduction test by tripping gas circulators is one of the safety demonstration tests. The reactor power safely brings to a stable level without a reactor scram and the temperature transient of the reactor-core is very slow. The TAC/BLOOST code was developed to analyze reactor and temperature transient during the coolant flow reduction test taking account of reactor dynamics. This paper describes the validation result of the TAC/BLOOST code with the measured values of gas circulators tripping tests at 30 % (9 MW). It was confirmed that the TAC/BLOOST code was able to analyze the reactor transient during the test.

Journal Articles

Heat exchanger performance in main cooling system on high temperature test operation at High Temperature Gas-Cooled Reactor 'HTTR'

Tochio, Daisuke; Nakagawa, Shigeaki; Furusawa, Takayuki*

Nihon Genshiryoku Gakkai Wabun Rombunshi, 4(2), p.147 - 155, 2005/06

High Temperature Engineering Test Reactor (HTTR) of high temperature gas-cooled reactor at JAERI achieved the reactor outlet coolant temperature of 950$$^{circ}$$C for the first time in the world at Apr. 19, 2004. To remove of generated heat at reactor core and to hold reactor inlet coolant temperature as specified temperature, heat exchangers in HTTR main cooling system should have designed heat exchange performance. In this report, heat exchanger performance is evaluated based on measurement data in high temperature test operation. And it is confirmed the adequacy of heat exchanger designing method by comparison of evaluated value with designed value.

Journal Articles

Rise-to-power test result of core outlet coolant tamperature of 950 $$^{circ}$$C in HTTR

Iyoku, Tatsuo; Nakagawa, Shigeaki; Takamatsu, Kuniyoshi

UTNL-R-0446, p.14_1 - 14_9, 2005/03

no abstracts in English

Journal Articles

Achievement of reactor-outlet coolant temperature of 950$$^{circ}$$C in HTTR

Fujikawa, Seigo; Hayashi, Hideyuki; Nakazawa, Toshio; Kawasaki, Kozo; Iyoku, Tatsuo; Nakagawa, Shigeaki; Sakaba, Nariaki

Journal of Nuclear Science and Technology, 41(12), p.1245 - 1254, 2004/12

 Times Cited Count:89 Percentile:97.72(Nuclear Science & Technology)

A High Temperature Gas-cooled Reactor (HTGR) is particularly attractive due to its capability of producing high-temperature helium gas and to its inherent safety characteristics. The High Temperature Engineering Test Reactor (HTTR), which is the first HTGR in Japan, achieved its rated thermal power of 30MW and reactor-outlet coolant temperature of 950$$^{circ}$$C on 19 April 2004. During the high-temperature test operation which is the final phase of the rise-to-power tests, reactor characteristics and reactor performance were confirmed, and reactor operations were monitored to demonstrate the safety and stability of operation. The reactor-outlet coolant temperature of 950$$^{circ}$$C makes it possible to extend high-temperature gas-cooled reactor use beyond the field of electric power. Also, highly effective power generation with a high-temperature gas turbine becomes possible, as does hydrogen production from water. The achievement of 950$$^{circ}$$C will be a major contribution to the actualization of producing hydrogen from water using the high-temperature gas-cooled reactors. This report describes the results of the high-temperature test operation of the HTTR.

JAEA Reports

Rise-to-power test in high temperature engineering test reactor in the high temperature test operation mode; Test progress and summary of test results up to 30MW of reactor thermal power

Takamatsu, Kuniyoshi; Nakagawa, Shigeaki; Sakaba, Nariaki; Takada, Eiji*; Tochio, Daisuke; Shimakawa, Satoshi; Nojiri, Naoki; Goto, Minoru; Shibata, Taiju; Ueta, Shohei; et al.

JAERI-Tech 2004-063, 61 Pages, 2004/10

JAERI-Tech-2004-063.pdf:3.14MB

The High Temperature engineering Test Reactor (HTTR) is a graphite moderated and gas cooled reactor with the thermal power of 30MW and the reactor outlet coolant temperature of 850$$^{circ}$$C/950$$^{circ}$$C. Rise-to-power test in the HTTR was performed from March 31th to May 1st in 2004 as phase 5 test up to 30MW in the high temperature test operation mode. It was confirmed that the thermal reactor power and the reactor outlet coolant temperature reached to 30MW and 950$$^{circ}$$C respectively on April 19th in the single operation mode using only the primary pressurized water cooler. The parallel loaded operation mode using the intermediate heat exchanger and the primary pressurized water cooler was performed from June 2nd and JAERI (Japan Atomic Energy Research Institute) obtained the certificate of the pre-operation test on June 24th from MEXT (Ministry of Education Culture Sports Science and Technology) after all the pre-operation tests were passed successfully in the high temperature test operation mode. Achievement of the reactor-outlet coolant temperature of 950$$^{circ}$$C is the first time in the world. It is possible to extend highly effective power generation with a high-temperature gas turbine and produce hydrogen from water with a high-temperature. This report describes the results of the high-temperature test operation of the HTTR.

Journal Articles

Performance test of HTTR

Nakagawa, Shigeaki; Tachibana, Yukio; Takamatsu, Kuniyoshi; Ueta, Shohei; Hanawa, Satoshi

Nuclear Engineering and Design, 233(1-3), p.291 - 300, 2004/10

 Times Cited Count:8 Percentile:48.76(Nuclear Science & Technology)

The High Temperature Gas-cooled Reactor (HTGR) is particularly attractive due to its capability of producing high temperature helium gas and due to its inherent safety characteristics. The High Temperature Engineering Test Reactor (HTTR), which is the first HTGR in Japan, was successfully constructed at the Oarai Research Establishment of the Japan Atomic Energy Research Institute. The HTTR achieved full power of 30MW at a reactor outlet coolant temperature of about 850$$^{circ}$$C on December 7, 2001 during the "rise-to-power tests". Two kinds of tests were carried out during the "rise-to-power tests". One is commissioning test to get operation permit by the government and another is test to confirm a performance of the reactor, heat exchanger, control system. From the test results of the "rise-to-power tests" up to 30MW, the functionality of the reactor and the cooling system were confirmed, and it was also confirmed that an operation of reactor facility can be performed safely.

Journal Articles

JAERI completed performance tests of the High Temperature Engineering Test Reactor (HTTR) at 950$$^{circ}$$C

Kawasaki, Kozo; Iyoku, Tatsuo; Nakazawa, Toshio; Hayashi, Hideyuki; Fujikawa, Seigo

Nihon Genshiryoku Gakkai-Shi, 46(8), P. 510, 2004/08

no abstracts in English

JAEA Reports

Proceedings of the 11th International Workshop on Ceramic Breeder Blanket Interactions; December 15 - 17, 2003, Tokyo, Japan

Enoeda, Mikio

JAERI-Conf 2004-012, 237 Pages, 2004/07

JAERI-Conf-2004-012.pdf:44.1MB

This report is the Proceedings of "the Eleventh International Workshop on Ceramic Breeder Blanket Interactions" which was held as a workshop on ceramic breeders Under the IEA Implementing Agreement on the Nuclear Technology of Fusion Reactors, and the Japan-US Fusion Collaboration Framework. In the workshop, information exchange was performed for designs of solid breeder blankets and test blankets in EU, Russia and Japan, recent results of irradiation tests, HICU, EXOTIC-8 and the irradiation tests by IVV-2M, modeling study on tritium release behavior of Li$$_{2}$$TiO$$_{3}$$ and other breeders, fabrication technology developments and characterization of the Li$$_{2}$$TiO$$_{3}$$ and Li$$_{4}$$SiO$$_{4}$$ pebbles, research on measurements and modeling of thermo-mechanical behaviors of Li$$_{2}$$TiO$$_{3}$$ and Li$$_{4}$$SiO$$_{4}$$ pebbles, and interfacing issues, such as, fabrication technology for blanket box structure, neutronics experiments of blanket mockups by fusion neutron source and tritium recovery system.

Journal Articles

Performance test results of mock-up test facility of HTTR hydrogen production system

Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo; Inagaki, Yoshiyuki; Takeda, Tetsuaki; Hayashi, Koji; Katanishi, Shoji; Takada, Shoji; Ogawa, Masuro; Shiozawa, Shusaku

Journal of Nuclear Science and Technology, 41(3), p.385 - 392, 2004/03

 Times Cited Count:17 Percentile:72.26(Nuclear Science & Technology)

Prior to construction of a HTTR hydrogen production system, a mock-up test facility was constructed to investigate transient behavior of the hydrogen production system and to establish system controllability. The Mock-up test facility with a full-scale reaction tube is an approximately 1/30 scale model of the HTTR hydrogen production system and an electric heater is used as a heat source instead of a reactor. Before the mock-up test, a performance test of the test facility was carried out in the same pressure and temperature conditions as those of the HTTR hydrogen production system to investigate its performance such as hydrogen production ability, controllability and so on. It was confirmed that hydrogen was stably produced with a hot helium gas about 120Nm$$^{3}$$/h which satisfy the design value and thermal disturbance of helium gas during the start-up could be mitigated within the design value by using a steam generator.

Journal Articles

Improvement of high-voltage performance of acceleration tubes by cleaning the walls with a high-pressure water jet

Takeuchi, Suehiro; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Yoshida, Tadashi

Nuclear Instruments and Methods in Physics Research A, 513(3), p.429 - 438, 2003/11

 Times Cited Count:3 Percentile:27.66(Instruments & Instrumentation)

At the JAERI Tandem accelerator, an acceleration tube replacing plan is proceeding to increase the acceleration voltage toward 20 MV. Lengthy conditioning is generally necessary for a large tube system. We had an idea to clean the tubes with high-pressure water-jet rinsing before installation. We cleaned tubes and tested them at 1 MV and 3 MV. The both results exhibited that the voltages went beyond the rated voltages and discharge activities were much less than the old records. During the test of new tubes at 3 MV, the conditioning proceeded well and an extremely stable condition was fulfilled within 24 hours. In conclusion, the cleaning was found to be a very promising way to improve high-voltage performance of the tubes in a large tube system.

JAEA Reports

Performance test results of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system (Contract research)

Inagaki, Yoshiyuki; Hayashi, Koji; Kato, Michio; Fujisaki, Katsuo; Aita, Hideki; Takeda, Tetsuaki; Nishihara, Tetsuo; Inaba, Yoshitomo; Ohashi, Hirofumi; Katanishi, Shoji; et al.

JAERI-Tech 2003-034, 129 Pages, 2003/05

JAERI-Tech-2003-034.pdf:7.62MB

no abstracts in English

JAEA Reports

Test plans of the high temperature test operation at HTTR

Sakaba, Nariaki; Nakagawa, Shigeaki; Takada, Eiji*; Nojiri, Naoki; Shimakawa, Satoshi; Ueta, Shohei; Sawa, Kazuhiro; Fujimoto, Nozomu; Nakazawa, Toshio; Ashikagaya, Yoshinobu; et al.

JAERI-Tech 2003-043, 59 Pages, 2003/03

JAERI-Tech-2003-043.pdf:2.54MB

HTTR plans a high temperature test operation as the fifth step of the rise-to-power tests to achieve a reactor outlet coolant temperature of 950 degrees centigrade in the 2003 fiscal year. Since HTTR is the first HTGR in Japan which uses coated particle fuel as its fuel and helium gas as its coolant, it is necessary that the plan of the high temperature test operation is based on the previous rise-to-power tests with a thermal power of 30 MW and a reactor outlet coolant temperature at 850 degrees centigrade. During the high temperature test operation, reactor characteristics, reactor performances and reactor operations are confirmed for the safety and stability of operations. This report describes the evaluation result of the safety confirmations of the fuel, the control rods and the intermediate heat exchanger for the high temperature test operation. Also, problems which were identified during the previous operations are shown with their solution methods. Additionally, there is a discussion on the contents of the high temperature test operation. As a result of this study, it is shown that the HTTR can safely achieve a thermal power of 30MW with the reactor outlet coolant temperature at 950 degrees centigrade.

Journal Articles

Replacement of accelerator tubes of the JAERI tandem accelerator with tubes cleaned by a high-pressure water jet

Takeuchi, Suehiro; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Ishizaki, Nobuhiro; Matsuda, Makoto; Tsukihashi, Yoshihiro; Kanda, Susumu; Tayama, Hidekazu; Abe, Shinichi; Yoshida, Tadashi

Dai-14-Kai Kasokuki Kagaku Kenkyu Happyokai Hokokushu, p.308 - 310, 2003/00

no abstracts in English

JAEA Reports

Rise-to-power test in High Temperature Engineering Test Reactor; Test progress and summary of test results up to 30MW of reactor thermal power

Nakagawa, Shigeaki; Fujimoto, Nozomu; Shimakawa, Satoshi; Nojiri, Naoki; Takeda, Takeshi; Saikusa, Akio; Ueta, Shohei; Kojima, Takao; Takada, Eiji*; Saito, Kenji; et al.

JAERI-Tech 2002-069, 87 Pages, 2002/08

JAERI-Tech-2002-069.pdf:10.12MB

Rise-to-power test in the HTTR has been performed from April 23rd to June 6th in 2000 as phase 1 test up to 10MW, from January 29th to March 1st in 2001 as phase 2 test up to 20MW in the rated operation mode and from April 14th to June 8th in 2001 as phase 3 test up to 20MW in the high temperature test operation mode. Phase 4 test to achieve the thermal reactor power of 30MW started from October 23rd in 2001. On December 7th it was confirmed that the thermal reactor power reached to 30MW and the reactor outlet coolant temperature reached to 850$$^{circ}$$C. JAERI obtained the certificate of pre-operation test from MEXT because all the pre-operation tests by MEXT were passed successfully. From the test results of rise-up-power test up to 30MW, the performance of reactor and cooling system were confirmed, and it was confirmed that an operation of reactor facility could be performed safely. Some problems to be solved were found through tests. By means of solving them, the reactor operation with the reactor outlet coolant temperature of 950$$^{circ}$$C will be achievable.

Journal Articles

Performance tests of reactor containment structures of the HTTR

Iigaki, Kazuhiko; Sakaba, Nariaki; Kawaji, Satoshi; Iyoku, Tatsuo

Transactions of 16th International Conference on Structural Mechanics in Reactor Technology (SMiRT-16) (CD-ROM), 7 Pages, 2001/08

no abstracts in English

Journal Articles

Integrity confirmation tests and post-irradiation test plan of the HTTR first-loading fuel

Sawa, Kazuhiro; Sumita, Junya; Ueta, Shohei; Suzuki, Shuichi*; Tobita, Tsutomu*; Saito, Takashi; Minato, Kazuo; Koya, Toshio; Sekino, Hajime

Journal of Nuclear Science and Technology, 38(6), p.403 - 410, 2001/06

 Times Cited Count:7 Percentile:48.66(Nuclear Science & Technology)

no abstracts in English

34 (Records 1-20 displayed on this page)